Before and After
Before and After
After 2023. New 100 Amp DSquare panel and DSquare breakers. Sense device installed for monitoring electric usage. Proper connectors at every exit. All news wires except for source. To test the installation, I loaded the panel with a 4 electric space heaters, hot water running, induction cooktop running, and Tesla charging and it ran flawlessly.